Revision broke 5 months to the day. Things were going great, then BAM. This one I think is the tube from the reservoir, but we’ll see. The doc is out of town, so I have an appt next week.

This crap sure leaves you deflated (pardon the pun}.

The first break was 11 months from the day of implant. This one was 5 months.

Re: Blowout II

Posted: Sun Aug 11, 2019 11:17 am
by LA Johnson
Has anybody here needed a repair/reconnection of the tube from the reservoir to the pump? I’m hoping this could be something which may be less involved with quick recovery. Thanks.

Re: Blowout II

Posted: Sun Aug 11, 2019 12:53 pm
by Frenchboy
Oh dude, I feel sorry for you. My advice : have a brand new implant, less risk of infection and less risk of mechanical failure .

It s the gold standard to have it replaced, not just repaired.
It will be ok

Re: Blowout II

Posted: Sun Aug 11, 2019 1:06 pm
by oldbeek
was the first and second device PREASSEMBLED or did they do the connections during the installation surgery?

Re: Blowout II

Posted: Sun Aug 11, 2019 1:23 pm
by tomas1
I've always been leery of someone connecting the tubing.
I guess if one only needs a revision, it would be worth the risk.
Not everyone is mechanically inclined and doctors really need some mechanical ability.

Re: Blowout II

Posted: Sun Aug 11, 2019 1:50 pm
by alibaba
Agreed tomas1.
L. A. Johnson, sorry you are having problems with your johnson again. Cheers man, despite the troubles.

Re: Blowout II

Posted: Sun Aug 11, 2019 4:27 pm
by LA Johnson
Frenchboy wrote:Oh dude, I feel sorry for you. My advice : have a brand new implant, less risk of infection and less risk of mechanical failure .

It s the gold standard to have it replaced, not just repaired.
It will be ok


Just a couple of days ago I saw a Dr. Kramer video where he basically says the same thing, though I did see one where he just replaced the connector between the pump and reservoir. I need to make a list of questions for my doc. thanks.

Re: Blowout II

Posted: Sun Aug 11, 2019 4:37 pm
by LA Johnson
oldbeek wrote:was the first and second device PREASSEMBLED or did they do the connections during the installation surgery?


The first one I'm pretty sure was pre-assembled. The revision was new pump and cylinders and connected the existing reservoir.

It sure can make you go bananas sorting this stuff out.

Re: Blowout II

Posted: Sun Aug 11, 2019 4:40 pm
by LA Johnson
tomas1 wrote:I've always been leery of someone connecting the tubing.
I guess if one only needs a revision, it would be worth the risk.
Not everyone is mechanically inclined and doctors really need some mechanical ability.


I couldn't agree more. I'm a bit conflicted on this, thanks.

Re: Blowout II

Posted: Sun Aug 11, 2019 4:43 pm
by LA Johnson
alibaba wrote:Agreed tomas1.
L. A. Johnson, sorry you are having problems with your johnson again. Cheers man, despite the troubles.


Thanks, things were going quite well with the revision before this.